      钢板天沟安装要具备什么条件
      2018-07-20 09:48:17   来源杭州摩鼎建材   

      钢板天沟安装条件跟方法
      Installation conditions and methods of steel plate gutter
      1安装条件
      1. Installation conditions
      钢板天沟安装前必须具备如下条件钢结构主体指梁柱已安装调整完毕所有高强螺栓已全部终拧完毕有女儿墙的工程女儿墙柱和相应的墙梁已安装调整结束钢板天沟已进行场焊接用的电焊机和焊工已到位
      The steel plate gutter must have the following conditions before installation: the main body of the steel structure (beam and column) has been installed and adjusted, and all the high-strength bolts have been finally screwed off. The parapet wall and the corresponding wall beam have been installed and adjusted to finish the project with parapet walls. The steel plate gutter has been carried out. The welding machine and welder used for welding have been in place.
      2安装
      2. Installation
      按设计图纸将相应的钢天沟倒运到位后按天沟的大小和重量采用吊机吊运或人工上运将天沟运到指定的安装区域并即时用电焊将天沟临时连接待一条天沟材料全部到位后沿天沟外侧用钢丝拉一条通线把整条天沟内外二条边全部调整到同一?#27605;?#19978;调整时注意使天沟拼接处的缝隙使之最小并用电焊进行临时固定随后用直径3.2mm的焊条将底下水平焊缝和两侧边的直焊缝进行满焊焊接时须注意焊接质量及控制焊接电流防止将天沟烧穿而增加不必要的麻?#22330;?#22825;沟底面与柱顶连接处可用断续焊将天沟底部与钢柱柱顶板进行焊接固定以增加整体的牢固当天不能焊完的天沟可用电焊用上述方法进行临时固定如条件许可?#37096;?#23558;天沟用钢丝绳同墙梁或天沟托架进行绑扎固定
      When the corresponding steel trench is reversed in accordance with the design drawings, the size and weight of the trench are carried by the crane or manual transport by the crane. The trench is transported to the specified installation area, and the trench is temporarily connected with the electric welding. When all the material is in place, a wire is drawn along the outside of the gutter with a wire, and all the two sides of the inner and outer sides of the gutter are adjusted to the same line. When adjusting, the gap in the junction of the gutter is minimized, and the welding is used for temporary fixation, and then the bottom welds and sides of the bottom are used by the electrode of the diameter 3.2mm. Full welding is carried out on straight weld. Attention should be paid to welding quality and welding current when welding, so as to prevent unnecessary wear and tear caused by burning the gutter. Intermittent welding can be used at the junction of the bottom of the gutter and the top of the column. The bottom of the gutter and the roof of the steel column column can be welded and fixed to increase the firmness of the whole. The sky ditch that can't be welded on the same day can be temporarily fixed by the welding method. If conditions permit, the steel wire rope can also be tied with the wall beam or the gutter bracket.

      相关热词搜索天沟 钢板 条件

      上一篇沃德落水系统的配件的作用
      下一篇天沟保养及维护方法有哪些



      版权所有杭州摩鼎建材有限公司地址杭州余杭工?#30331;?br /> 联系电话0571-88667701传真0571-88666557联系人张毅 18989876637 登录入口
      ƱְϢ¼

          <blockquote id="s8gus"></blockquote>
          <rt id="s8gus"><small id="s8gus"></small></rt>
          <acronym id="s8gus"><small id="s8gus"></small></acronym>
          <acronym id="s8gus"><small id="s8gus"></small></acronym>
          <tr id="s8gus"><optgroup id="s8gus"></optgroup></tr><sup id="s8gus"></sup>

              <blockquote id="s8gus"></blockquote>
              <rt id="s8gus"><small id="s8gus"></small></rt>
              <acronym id="s8gus"><small id="s8gus"></small></acronym>
              <acronym id="s8gus"><small id="s8gus"></small></acronym>
              <tr id="s8gus"><optgroup id="s8gus"></optgroup></tr><sup id="s8gus"></sup>